Construction of Bridges (4 Major and 3 minor) and associated works for provision of 3rd line between Udhna and Surat (Km. 00 to 2.65) in connection with Udhna – Jalgaon Doubling project on Mumbai Division of Western Railway
Rail Connectivity to Old Bedi Port from Windmill station in Jamnagar District, Total length of 2.33 KM with 25 KV AC Electrification in Rajkot Division of Western Railway
Construction of Major Bridge between Daldi (Excl) – Rajkot Stations in connection with Surendranagar – Rajkot Doubling Project (km 688 to km 742.43)
Construction of MSIL in Plant Railway Yard, Total Length 1.19 km with 25 KV AC Electrification in Ahmedabad División of Western Railway
Western Railway Project Gauge conversion of Katosan Road – Bechraji (26.6 KM) meter Gauge to Broad Gauge along with New MSIL BG siding (Approx. 3 KM) at Bechraji with 25 KV AC Electrification in Ahmedabad Division of Western Railway
Earthwork & Blanketing in embankment / cutting in formation of new BG double line including yards, bridge approaches etc., Construction of bridge work ( Major /Minor– foundation, sub structure and super structure) as per Railway’s approved Design and drawing, carting of steel girder component, construction of Retaining /Boundary/Toe wall, supply & spreading of machine crushed stone ballast, Laying and linking of BG track for Main line, loop lines and Points & Crossing etc in section / yards, Transportation of P way materials, Welding of Rails and other incidental miscellaneous work etc between RAU &Dr Ambedkar nagar station (9.51 km) in connection with doubling of RAU-Dr Ambedkarnagar section (9.51 km) in Ratlam Division of Western Railway.